Wednesday, September 24, 2014

McKinnon Flats road work Day 3

All photos, © Bow River Shuttles

The third culvert was installed today. The second culvert that was installed yesterday needed to be 'tweeked'.

A padfoot packer was doing its thing - packing the road. This type of packer is intended to lea
ve the surface somewhat rough, so that it will have a better chance of holding on to the gravel on this very steep road.

They plan to begin hauling in the gravel tomorrow.




All hands were on deck for whatever 'tweeking' was required on the second culvert, which was installed yesterday.



This is the sign at the junction of Highway 22X and Range Road 274