McKinnon Flats road work Day 2

All photos, © Bow River Shuttles

The D6 Cat was carving out a drainage ditch along the road.



Two culverts were being installed today, with a third one going in tomorrow.


The bobcat was repairing the section of the road where the first culvert had been installed.


The excavator was digging a trench for the second culvert.