Saturday, August 6, 2011

Stoney Trail Ring Road

22X @ 88 St SE.  All photos: Bow River Shuttles
Those of you who have made your way to or from McKinnon Flats will know that work continues at a seemingly rapid pace on each of the interchanges along Highway 22X.


We’ve never had an opportunity to see so many pieces of heavy earth moving equipment on one stretch of road at the same time.

At times, there are more than a dozen ‘Euclid’ tractor-scrappers, along with huge dump trucks, graders and other equipment on just one corner of an intersection. 

22X @ 52 St SE
The signs posted along the road tell us that work is scheduled to be completed by the fall of 2013.

Check the links below for drawings/maps of each of the interchanges. It looks like the beginning of the New Jersey Turnpike!

Click directly on map for larger image 22X/Marquis of Lorne Trail @ 88 St


No comments: